This website is intended to satisfy the requirement under the CCR Rule (section 40 CFR Part 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. Additional required information will be posted when it is available.
-
Annual CCR Fugitive Dust Control Report
CTI Closure Initial Cost Estimate
PEAP 1st Semiannual Groundwater Report
PEAP 2nd Semiannual Groundwater Report
Public Meeting Notification_August
Public Meeting Notification_November
Q&A from CTI Development Public Meeting_November.pdf
WAPC Q1 Groundwater Report (pdf)
WAPC Q2 Groundwater Report (pdf)
-
-
-
PEAP 1st Semiannual Groundwater Report
PEAP 2nd Semiannual Groundwater Report
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Annual Consolidated Report
PEAP Closure Alternative Analysis
Site Annual CCR Fugitive Dust Control Report
Site IDNR Dam Inspection Report
WAPC Annual CCR Surface Impoundment Inspection Report
-
PEAP 1st Semiannual Groundwater Report
PEAP 2nd Semiannual Groundwater Report
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Annual Consolidated Report
Site Annual CCR Fugitive Dust Control Report
Site IDNR Dam Inspection Report
WAPC Annual CCR Surface Impoundment Inspection Report
WAPC Annual Consolidated Report
-
-
2019 ATON_CTI_Phase I ESA_Wood River Power Plant (pdf)
2019-Wood River-Corrective Measure Assessment Notification -East Ash Pond (pdf)
2019-Wood River-SSL determination notification-Primary East Ash Pond (pdf)
2019 Annual Fugitive Dust Control Report - All CCR Units (pdf)
2019 Annual Surface Impoundment Inspection Certification Report-Primary East Ash Pond (pdf)
2019 Annual Surface Impoundment Inspection Certification Report-West Ash Pond 1, 2E, 2W (pdf)
2019 - Primary East Ash Pond - Annual GW Monitoring and CA Report (pdf)
-
PEAP 1st Semiannual Groundwater Report
PEAP 2nd Semiannual Groundwater Report
PEAP Annual CCR Groundwater Monitoring and Corrective Action Report
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Corrective Measure Assessment Notification
Site Annual CCR Fugitive Dust Control Report
WAPC Annual CCR Groundwater Monitoring and Corrective Action Report
-
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Annual Groundwater Monitoring and Corrective Action Report
PEAP Groundwater Monitoring System Certification
PEAP Sampling and Analysis Plan
PEAP Statistical Method Certification
Site Annual CCR Fugitive Dust Control Report
Site Hydrogeologic Monitoring Plan
Site Statistical Analysis Plan
WAPC Annual CCR Surface Impoundment Inspection Report
WAPC Annual Groundwater Monitoring and Corrective Action Report
WAPC Groundwater Monitoring System Certification
WAPC Initial Hazard Potential Classification Assessment Report
WAPC Initial Hazard Potential Classification Assessment
-
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Initial Hazard Classification Assessment Report
PEAP Initial Hazard Classification Assessment
PEAP Notice of Intent to Close CCR Unit and NOA
Site Annual CCR Fugitive Dust Control Report
Site Closure Plan Notice of Availability
Site History of Impoundment Construction
WAPC Annual CCR Surface Impoundment Inspection Report
WAPC Closure and Post-Closure Care Plan
WAPC_Pond 1 Closure Plan Rev. 1
WAPC_Pond 1 Notice of Intent to Close CCR Unit and NOA
WAPC_Pond 1 Post-Closure Care Plan
WAPC_Pond 2E Notice of Intent to Close CCR Unit and NOA
-