This website is intended to satisfy the requirement under the CCR Rule (section 40 CFR Part 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. Additional required information will be posted when it is available.
-
-
-
-
-
-
PEAP Annual CCR Groundwater Monitoring and Corrective Action Report (pdf)
PEAP Annual CCR Surface Impoundment Inspection Report (pdf)
Site Annual CCR Fugitive Dust Control Report (pdf)
WAPC Annual CCR Groundwater Monitoring and Corrective Action Report (pdf)
WAPC Annual CCR Surface Impoundment Inspection Report (pdf)
WAPC Q1 Groundwater Report (pdf)
WAPC Q2 Groundwater Report (pdf)
-
2019 ATON_CTI_Phase I ESA_Wood River Power Plant (pdf)
2019-Wood River-Corrective Measure Assessment Notification -East Ash Pond (pdf)
2019-Wood River-SSL determination notification-Primary East Ash Pond (pdf)
2019 Annual Fugitive Dust Control Report - All CCR Units (pdf)
2019 Annual Surface Impoundment Inspection Certification Report-Primary East Ash Pond (pdf)
2019 Annual Surface Impoundment Inspection Certification Report-West Ash Pond 1, 2E, 2W (pdf)
2019 - Primary East Ash Pond - Annual GW Monitoring and CA Report (pdf)
-
2018 03 23 PEAP Closure - HDR Geotechnical Design_Slope Stability Report (pdf)
2018 03 23 PEAP Closure - HDR Geotechnical Design_Slope Stability Report (pdf)
2018 West Ash Ponds Assessment Monitoring Notification (pdf)
2018 Annual Fugitive Dust Control Report-All CCR Units (pdf)
2018 Annual Groundwater Monitoring and Corrective Action Report-Primary East Ash Pond (pdf)
2018 Annual Groundwater Monitoring and Corrective Action Report-West Ash Pond 1, 2E, 2W (pdf)
2018 Annual Surface Impoundment Inspection Certification Report-Primary East Ash Pond (pdf)
2018 Annual Surface Impoundment Inspection Certification Report-West Ash Pond (pdf)
2018 Annual Surface Impoundment Inspection Certification Report - West Ash Pond 1
-
2017 10 17 PEAP Sampling and Analysis Plan (pdf)
2017 10 17 WAPC Sampling and Analysis Plan (pdf)
2017 10 17 Statistical Analysis Plan_Dynegy Midwest Generation, LLC.pdf
2017 10 17 Wood River CCR Primary East Ash Pond Monitoring System Certification Letter (pdf)
2017 10 17 Wood River CCR Primary East Ash Pond Statistical Plan Certification (pdf)
2017 10 17 Wood River CCR West Ash Ponds 1 2E 2W Monitoring System Certification Letter (pdf)
2017 10 17 Wood River CCR West Ash Ponds 1, 2E, 2W Statistical Plan Certification (pdf)
2017 Wood River Annual CCR Fugitive Dust Control Report (pdf)
2017 Wood River CCR East Ash Pond Dam Summary Report (pdf)
2017 Wood River CCR Surface Impoundment EAP (pdf)
2017 Wood River CCR West Ash Pond 1 Dam Summary Report (pdf)
2017 Wood River CCR West Ash Pond 2E Dam Summary Report (pdf)
2017 Wood River CCR West Ash Pond 2W Dam Summary Report (pdf)
2017 Wood River CCR West Ash Pond 1, 2E and 2W Annual Groundwater Monitoring Corrective Action (pdf)
2017 Documentation of Initial Hazard Potential Classification Assessment (pdf)
-
PEAP Annual CCR Surface Impoundment Inspection Report
PEAP Initial Hazard Classification Assessment Report
PEAP Initial Hazard Classification Assessment
PEAP Notice of Intent to Close CCR Unit and NOA
Site Annual CCR Fugitive Dust Control Report
Site Closure Plan Notice of Availability
Site History of Impoundment Construction
WAPC Annual CCR Surface Impoundment Inspection Report
WAPC Closure and Post-Closure Care Plan
WAPC_Pond 1 Closure Plan Rev. 1
WAPC_Pond 1 Notice of Intent to Close CCR Unit and NOA
WAPC_Pond 1 Post-Closure Care Plan
WAPC_Pond 2E Notice of Intent to Close CCR Unit and NOA
-